Model:WS-EVE ALARM
Model:WS-CAR3DET
Model:WS-LPR600
Model:WS-CAR900
Model:
Products
Solutions
About us
Contact us
Agent
Member login
Innovative Smart Positioning Technology for Warehouse Management The RTLS UWB Pallet Management System integrates Ultra-Wideband (UWB) high-precision positioning with RFID automatic identification, providing intelligent asset tracking for warehousing, logistics, and manufacturing industries. The system operates through the collaborative work of ceiling-mounted base stations, forklift locators, and pallet RFID tags, precisely achieving real-time positioning and dynamic management of pallets and equipment, giving you comprehensive control over every aspect.
This solution offers high-accuracy location tracking, automatically records pallet loading and unloading movements, and seamlessly integrates with existing WMS or ERP systems.
Bid farewell to tedious manual inventory costs, significantly enhance warehouse operational efficiency, and achieve process automation and data transparency.
Utilizes UWB (Ultra-Wideband) technology to achieve positioning accuracy within 10 centimeters in ideal environments, ensuring the precision and reliability of asset location tracking.
The system provides high-frequency real-time location information, perfectly adapting to dynamic logistics and warehousing scenarios, allowing managers to monitor asset movements at all times.
RFID Automatic Identification
Integrates a 125K RFID reader to automatically read tags and instantly log the placement or removal of pallets, completing data recording without manual intervention.
The system is optimized for industrial environments, maintaining excellent stability and reliability even in complex situations involving metal reflections, equipment electromagnetic noise, and other interferences.
Supports simultaneous tracking of multiple pallets and equipment, scalable for large-scale warehousing applications, meeting the system flexibility and expansion capabilities required for enterprise growth.
The RTLS UWB Pallet Management System is specifically designed for modern warehousing, manufacturing, and supply chain management needs, providing a comprehensive smart tracking solution. Whether it's pallet inventory in large logistics centers, material tracking on manufacturing floors, or efficiency optimization in supply chain hubs, this system delivers exceptional performance, helping enterprises achieve their digital transformation goals.
Warehousing and Logistics Management
Smart Supply Chain Operations
This innovative solution ingeniously combines active RFID tags with cutting-edge UWB positioning technology, aiming to provide you with unprecedented comprehensive pallet tracking and intelligent forklift management. This solution is particularly suitable for large-scale operational environments with a vast number of pallets and extensive areas, effectively improving management efficiency and accuracy. Through the perfect collaboration of key components—pallet tags, forklift locators, item detectors, and positioning base stations—we meticulously build a seamless and efficient intelligent positioning ecosystem to help your enterprise achieve operational excellence.
Model: WS-ATAG6325-X
Installed on pallets, identifying pallet numbers and real-time status. Utilizes active design to ensure stable signals and support long-range reading.
Model: WS-RTLS-125K
Installed on forklifts, tracking forklift positions and interactions with pallets. Integrates 125K RFID functionality for automatic pallet tag identification.
Model: WS-Hawkeye-C
Intelligently detects items or pallets on forklifts, automatically recording changes in cargo loading and unloading. Wireless design precisely determines forklift operational status.
RTLS Positioning Base Station
Model: WS-RTLS-PR
Installed in the warehouse to receive positioning signals and calculate precise locations. Supports PoE power supply, ensuring full-area positioning coverage.
This solution, centered on pure UWB positioning tag technology, offers a simplified deployment process. It is particularly suitable for managing valuable or high-value palletized items, providing more detailed tracking and security. Notably, in addition to general-purpose positioning tags, our innovative UWB positioning display tags can instantly present pallet contents and target locations, bringing unprecedented real-time visibility and decision support to your warehouse management, making it a key differentiating advantage for improving operational efficiency.
Model: WS-UWB65L
Installed on pallets. Immediately begins precise positioning within the warehouse system.
Model: WS-UWBPDT
Installed on pallets. Provides real-time insight in pallet contents and target locations, assisting with precise management and efficient decision-making.
Installed on warehouse ceilings, receiving signals from all UWB positioning tags. Calculates positions using algorithms, achieving precise, full-area tracking.
Tell us about your site and requirements and our engineers will help plan the right products and system.